Forest Lakes

 

 

Domestic Water Improvement District

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Master Plan

 

 

 

 

 

 

July 1, 2009

 

  • I. Executive Summary

This plan contains the vision that the Board and staff of the Forest Lakes DWID have for the future of the District. It will be reviewed quarterly and updated annually as new information and circumstance dictate. 

 

The District has made great strides since it was established in 1992. It has gone from a business with limited standards, non-compliant distribution system and deficient administration, to an organization with rules and regulations that create fairness for customers, full ADEQ compliance and a reliable water supply. 

 

This does not mean that we are done. When we stop improving and progressing, we are going backwards. This definitely applies to the water sources, equipment and administration of the Water District. Some of the major improvements needed include:

 

  • Upgrade the remaining 60,000 feet of water lines.
  • · Improvements in reliability and quality of electrical power by installing 3 phase electrical to the snow well
  • Upgrade the system to provide the required volume through out the system
  • Continue to implement our water conservation program

The District must also follow all Federal and State rules and regulations. This provides the customers with water that continues to improve in quality. The most recent example is the change in the arsenic limits from 50ppb to 10ppb. This resulted in taking the snow well off line, plus requiring the District to blend the water from two wells to reduce the arsenic level by January 2006.

 

In addition to capital improvements, the District considers maintenance of existing equipment, facilities and resources very important. It is less expensive to maintain what we have then to replace it; therefore, investments have been made in routine maintenance of water storage tanks, upgrades of administrative rules and plans, etc. It is the intent of the District to continue this policy.

 

It has been said that we have plenty of water, so why are we worried about conservation? When we look at the problems of our neighbors in other cities and towns on the Mogollon Rim, we see major conservation programs being implemented and in some cases resorting to hauling water. The people of Forest Lakes deserve better then that and therefore must plan ahead to use the resources we have responsibly. 

 

Forest fires continue to be a threat to our community and water is a big part of our protection. During the fire seasons our District has provided thousands of gallons of water under emergency conditions. The District is also committed to working with the Forest Lakes Fire District to improve the number and spacing of the fire hydrants and the volume of water that can be delivered. 

 

As in every business, technology must come into play to improve the effectiveness and efficiency of the organization. The District will be using new technology in the monitoring of wells, meter reading, and administrative systems.

 

Our current sources of funding are property taxes and fees for various services including the monthly basic service and a water usage fees. The District will pursue other sources such as grants to supplement existing monies. With the federal mandate to remove arsenic there may be a need to borrow money, but it is the intent of the Board that this be kept to a minimum and avoided if possible.

 

During our annual review of the Master Plan the Board reemphasized the need to set priorities. There is much to do and limited financial resources, therefore the Board established a priority for major projects in the following order: 

  • Compliance with federal law – all changes or modifications to the water system necessary to comply with federal and state law. This includes compliance with the arsenic standard. 
  • Improvements to the existing distribution system – replacement of sub-standard water mains, valves and related equipment.
  • Water conservation - Installation of water meters and other equipment and administrative programs to encourage the conservation of water.
  • Implement water rates and fees to maintain adequate funds available to complete federal mandated and operational improvements.
  • Implement security policies, procedures and devices necessary to protect the water supply and distribution systems.

The following is the schedule of events regarding the Master Plan and the budget process:

 

 

July

Budget submitted to the County Board of Supervisors.

Prior fiscal year Master Plan progress review.

Oct

Review current Master Plan progress.

Jan

Review current Master Plan Progress.

April

Review current Master Plan progress.

Draft revisions to the Master Plan for the next fiscal year.

May

Review the draft budget for next fiscal year.

June

Board approve the budget and Master Plan for next fiscal year.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Introduction

Forest Lakes is home to full time, seasonal, and weekend residents. Even though we use our property in different ways, there is a common need that we all have and that is water. To continue to provide high quality water at reasonable prices, the Board of Directors and staff at the Forest Lakes Domestic Improvement District (DWID) has developed this Master Plan that provides the foundation for the next five years. The Plan will to be used in operational and financial planning and to inform the public about the projects and efforts being made to keep clean water flowing. 

 

Long range planning is not a one-time event. The plan is an evolving document that will be updated annually as more details become available and conditions change. A few of the conditions that will change the plan are significant increases in the demand for water, the amount of available funds, and policy changes placed on the system by the State and Federal government. 

 

    •  
  • DWID Description

The Forest Lakes Domestic Water Improvement District was created in 1992 in accordance with Arizona Revised Statues Title 48 to manage the water supply for all District residents. 

 

A five member Board of Directors is elected by property owners of the District. Term of office is four years with positions expiring on alternating two-year election periods. Daily management of the District is done by a state-certified Water Operations Manager, who is supported by an Administrative Assistant and various part time or full time assistance based on seasonal requirements. The State of Arizona requires a trained and certified operator be on site or available at all times; therefore, a second certified operator provides part time support to the system.

 

The source of water for the district includes four wells that can produce over 1000 gallons of water per minute when running at full capacity.

 

Water is stored in three tanks that have a capacity of 674,000 gallons and then distributed to over 856 residents and 13 commercial customers via 26 miles of pipe. The distribution system has a redundant supply system so that if one tank or well is not operative, water can still be provided to all connections. It should be noted that emergency breaks in a main or service line to a customer will still disrupt the flow of water. 

 

The system also provides water to 77 fire hydrants that are used by the Forest Lakes Fire District to fight local fires as well as assisting the Forest Service to fight forest fires in the immediate area.

 

The number of connections is increasing at about 2 to 4 per year due to vacant lots becoming occupied.

 

Financial resources to operate, maintain and improve the water systems come from customer fees that are collected monthly and from property tax collected by Coconino County. The District is in compliance with County rules that govern the District. An example of this is the requirement that an annual budget be submitted for review to the County Board of Supervisors. 

 

The District is also in compliance with all applicable rules and regulations published by the State of Arizona. This includes completing all required water sampling and water testing. The Federal Department of Environmental Protection has responsibility for the enforcement of the Safe Drinking Water Act established by the Congress. The enforcement for Arizona is delegated to the Arizona Department of Environmental Quality (ADEQ), which implements Federal rules such as the recent stricter rule governing the amount of arsenic allowed in drinking water. The District must also comply with rules and regulations promulgated by the State Department of Water Resources. An example of this agency’s responsibility is the authorization of all well drilling. 

 

The Water District also publishes appropriate rules and regulations, such as criteria for connection, use of water, billing procedures, etc. These rules and regulations provide consistency in the delivery of water, as well as fairness to the users.

 

The Water District is a non-profit organization; therefore, it is mandatory for all customers to use the system in a responsible manner.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Vision

To provide adequate clean water for domestic use and related services to all customers and to support other community water requirements at a reasonable cost.

  • Mission

The following statements describe the Board’s vision for the Water District.

 

    • The District will provide clean water to all customers in adequate volumes without interruption.
    • All district equipment; production and distribution systems will be maintained at established standards.
    • The District will be in compliance with all rules and regulations established by Federal, State and Local government.
    • Security systems and procedures will be implemented and maintained to protect the water systems from unauthorized access and damage.
    • District administrative policies and procedures and finances will be reviewed annually, maintained and followed.
    • The District will provide water in a cost effective manner and strive to be debt free.
    • A qualified staff will be available to operate and maintain the water system.

Values

The following statements represent the foundation upon which the District is managed.

 

    • Customers must be treated fairly and with respect.
    • A well-trained and knowledgeable staff is key to a successful water service.
    • A standard of excellence for quality and quantity of water must be maintained.
    • Good business practices and procedures are essential to the system.
    • A Board of Directors that is dedicated and knowledgeable about water systems and works as a team with a highly qualified staff is essential to an effective and efficient water system operation.
    • Water is a critical element to life and a resource issue in the State of Arizona; therefore, it must be used wisely and conserved in accordance with established programs.

 

Water Production and Distribution

Goal 1: Replace and update components of the production and distribution system to enable uninterrupted water supplies.

 

Description:

As stated in the DWID Description, the production and distribution system includes four wells, three tanks, approximately 25 miles of various size pipe and assorted pumps and valves to get the water from the ground to each connection. Maintaining this facility is vital to keep the water flowing.

  • The system is currently in compliance with all Federal and State rules and regulations.
  • There remains approximately 60,000 feet of distribution pipe to be replaced or upgraded.

 

Strategy:

The strategy is to replace a segment of the distribution system each year if funds are available in the Water District Capital Improvement Budget. Fire hydrants and service lines will be upgraded as appropriate with all distribution line improvements. When additional looping can be done in the course of other construction, it will also be accomplished.

  • Pending financial capability of the District, the following objectives include the pipe upgrades and replacements that are expected within the next five years. 

 

  •  
  • Objective 1: Complete analysis project plan and upgrade Trout Springs, Aspen and Pinto area.
  • Objective 2: Complete analysis, project plan and install an Arsenic treatment  at the Snow well ( including 3 Phase power )
  • Objective 3: Complete analysis, project plan and upgrade Rim Loop Area

 

Objective 4: Complete analysis, project plan and upgrade the West Loop

  •     and canyon area.

 

 

 

Goal 2: Maintain a system that provides required level of water pressure throughout the district.

 

Description

The change in elevation between various areas within Forest Lakes causes the water pressure to vary as much as 40-50 pounds. Connections at the highest levels are experiencing low water pressure while the connections at the lowest elevations have very high pressure. 

  • Strategy:

There is more than one alternative to resolve this problem; our contracted engineer identified an alternate water routing process. 

 

 

Objective 1: The upgraded pipe size will aid in providing required volume through out the district and improve fire support capabilities.

 

 

Goal 3: Perform maintenance on the production and distribution system.

Description

The production and distribution systems require routine maintenance that is currently being performed. There are some procedures that should be improved to ensure all equipment is accounted for and is working properly.

 

Strategy:

The existing staff will implement necessary changes and improvements as time permits.

    • Objective 1:  Upgrade the mapping of all valves and other key distribution
  • components. (On going - currently approximate 60% completed – estimated completion June 2010)

 

Objective 2: Implement and follow a program of exercising all valves on a established schedule. (On going )

 Initial exercising done during the mapping updating process, plan to be available June 2010)

Target is a 3 years exercising cycle program.

  • Objective 3: Continue to maintain an inventory of all spare parts adjusting requirements based on usage data. (On going - part of daily operation)

 

 

 

 

Goal 4: Ensure that there is adequate utility and emergency electrical power.

Description

APS provides power to Forest Lakes and the well location that is not a true three-phase. This results in greater wear and shortens the life expectancy of all motors. 

There are backup generators located at all four wells to provide backup power in the case of APS power outages. 

 

Strategy:

Continuing to encourage APS to improve the power supply 3 phase power to the Snow well.

  • Objective 1: Maintain communications with the appropriate leadership at APS to encourage them to provide three-phase power to all wells. (On going - review annually)

 

 

Goal 5: Maintain and follow a plan to encourage all customers to conserve water.

 

Description

Many areas of Arizona are under severe water restrictions and laws have been passed that control water usage in these areas. As responsible managers of a critical resource the Forest Lakes DWID Board should implement a conservation program that is consistent with other parts of the State. Currently there is a flat rate for the basic service plus a usage charge per one thousand gallons used. Although there is ample water available at this time, we should still be using this resource responsibly. 

 

 

Strategy:

Develop additional methods to encourage the conservation of water.

  • Objective 1: Develop a water conservation program. (On going review annually– ADWR System Water Plan)

 

Objective 2: Monitoring our new meter system and communicating on possible leaks in a timely manner. (On going – at least monthly with our billing system)

 

 

 

Goal 6: Develop and follow security procedures that protect district facilities from unauthorized access and damage. 

Description

Protection of DWID property from unauthorized access and damage is required to protect property as well as ensuring that all water supplies are protected from contamination by vandals or terrorists.

 

 

Strategy:

Install and use electronic monitoring devices and ensure that all authorized persons are properly trained in the emergency procedures for security.

 

Objective 1: Update the DWID Emergency Plan to include procedures for unauthorized intrusion at any DWID facility. (Updated – Review annually)

 

 

Goal 7: Maintain a plan that will provide water to all customers in any emergency.

 

Description:

The District is obligated to provide drinking water to all customers in the event of an emergency. There must be a plan and procedures to address various kinds of emergencies and the course of action to deal with the situation.

 

Strategy:

Review the Emergency Plan annually to ensure that all known situations are addressed and that all appropriate staff is familiar with procedures.

 

Objective 1: Develop and maintain procedures in the Emergency Plan to fix major water line ruptures or address a natural disaster. (In place review annually)

  • Objective 2: Maintain contingency agreements with one or more water companies to receive water in the event of a major water outage in the Forest Lakes District, add this information to the Emergency Plan. (In place)

 

Objective 3: Maintain procedures in the Emergency Plan to address a major contamination event. (In Place)

 

Compliance

Goal 1: Comply with all Federal, State and Local water quality rules and regulations.

 

Description:

The Arizona Department Environmental Quality (ADEQ) requires water samples to be taken during specific periods of time and tested at a certified laboratory to meet EPA standards. The Federal Environmental Protection Agency (EPA) continues to review the Maximum Contaminant Levels (MCL) of various elements and minerals. The District must also comply with rules governing operator certification and general operation, administration, and facility standards.

  • Strategy:

The MCL for arsenic changed from 50ppb to 10ppb effective January 2006. The District has two wells above the 10ppb. Treatment/solution alternatives have been reviewed and the most appropriate selected.

 

Objective 1: Identified options to put Snow well back on line.

 

Objective 2: Continue to compile and publish a Consumer Confidence Report annually according to ADEQ standards. (On going)

 

 

Financial Management

Goal 1: Maintain and improve sources of revenue.

 

Description:

There are two primary sources of funding that support the District: property tax and fees from District customers. These funds are used for system operations and maintenance and capital improvement. There is also a major shortage of revenue to accomplish the identified capital improvements identified.

 

Strategy

Install a billing method that will charge the customers based on volume used.  Investigate and pursue grants, loans or bonds to increase capital improvement funding.

 

Objective 1: Consider a multi level billing system, after 2 years of data is collected.

 

Objective 3: Conduct an annual rate review to ensure that the District’s operational expenses can be met. (On going annually)

 

 

 

 

Goal 2: Maintain appropriate financial management and reporting procedures.

 

Description:

An annual budget is developed and approved by the District Board. The budget is then forwarded to the Coconino County Board of Supervisors for review. Monthly financial reports are produced for review and approval by the District Board. The financial records are audited annually, are in compliance with Federal standards. They are in compliance with OMB 133 Circular. This change will improve the chances of acquiring federal grants. 

 

There was a public hearing in 2008 that provided for a three year water fee increase of 15% in 2003, 10% in 2004, and a 5% in 2005. This was the first time in a decade that the fee changed. After 14 years of no tax increase we increased the tax by 18 cents per thousand.

 

In a continuing effort to control cost no additional tax rate change is being requested at this time.

 

Strategy: 

Conduct rate reviews by-annually to ensure that there are adequate funds for operation and maintenance as well as capital improvements. Update the audit procedures to improve the chances of receiving grants. 

 

Objective 1: Continue to develop annual budget by April of each year. (On going - April )

  • Objective 2: Continue to develop monthly financial reports. (On going - Monthly)
  • Objective 3: Continue to require annual audits of the financial records. The audit is in compliance with Federal Office of Budget and Management Circular 133. (On going – compliant - August)

Administration

Goal 1: Maintain District rules and regulations

  • Description:
  • Rules and regulations are essential to consistent management of the District business and to maintaining fairness to all customers. The District has published rules and regulations governing the connection and use of water, safety practices, personnel procedures, and emergency procedures. 
  • Strategy:

Review all rules, regulations, procedures and planning documents and update as required to ensure they apply appropriately to the current environment. 

 

 

Objective 1: Continue to review and publish appropriate changes as required to the rules and regulations. (Annually)

 

Objective 2: Continue to review and publish all internal administrative policies and procedures as required. .  (Annually)

 

Objective 3: Address anomalies identified by Auditor’s Management Letter.

(Annually)

 

 

 

 

Goal 2: Maintain all planning documents.

Description:

The 2003 Master Plan is the first step in documenting a long-range plan. The District Board considers this an important step toward improving the management of larger projects as well as the routine work. 

 

Strategy:

Annually update and review the Master Plan as necessary. Develop a short-range plan that will be considered during the development of the annual budget. Larger projects will also have more detailed project plans developed by the District staff.

 

Objective 1: Review and update the District Master Plan annually and monitor progress quarterly.

 

Objective 2: Develop and follow project plans for all large projects over $50,000. (On going)

 

 

Other Management Issues

Goal 1: Establish and monitor contracts for outside services

  • Description:
  • The District periodically requires technical or professional expertise not available within the District Staff. To ensure that these services are available at a reasonable cost, contracts are awarded for these services for a period of time. Support is also available through membership in associations and working with other water companies.
  • Strategy:

Review existing contracts periodically and issue bid requests as necessary. Continue relationships with associations and groups that can provide technical assistance to the District at low or no cost.

  • Objective 1: Continue to annually review all service contracts, including Engineering and Electrical services, as well as attorney and audit consultants. (On going)
  • Objective 2: Continue to coordinate activities with ADEQ, RWAA, ADWR, and special districts and report to the Board as appropriate. (On going- reviewed annually)

 

 

Goal 2: Provide District activity information to the customers.  

Description:

The customers are important to the success of the Water District; therefore, it is important that information regarding the activities of the District be easily accessible by the customer. This is particularly important to the water conservation program.

 

Strategy: 

Utilize newsletters, the Internet, monthly board meetings, and board meetings of other groups to communicate with our customers.

 

 

Objective 1: Continue to maintain a customer complaint process that will address all complaints within 1 week after receipt. In accordance with rules and regulations.

 

Objective 2: Continue to provide articles for the FLOA newsletter and produce a District newsletter when appropriate.

  • Objective 3: Continue to use the FLOA meetings and FLOA web site to communicate significant activities and future plans to the residents as required.

 

 

Operational Plan

The Master Plan contains goals and objectives that will be accomplished over the next five years. To be more specific, the following operational plan contains the specific objectives that will be accomplished each year. Note that the years identified are consistent with the fiscal year of the District which is July 1st through June 30th. In some cases large projects will overlap. In other cases, the objective may need to be repeated. In these cases, the objective will be shown in all years to which it applies or continues.

 

The following is a summary of the Objectives that will be reported as identified during monthly meetings.

 

 

  •  
  • Objective

    Date

    Comments

    Provide Project Plans to the board for all projects over $50,000.

     

     

    Status approved plans monthly

    Compile and publish a Consumer Confidence Report

     

    Annually

     

    Inspect inventory of all spare parts

     

    Quarterly

    Part of annual operation

    Review all service contracts

     

    Annually

    Recommend in April with budget

    Conduct annual financial and operations audit

     

    08/01/07

     

    Provide monthly customer billing

     

    Monthly

    On monthly spreadsheet presented at Board Meetings

    Review all internal policies and procedures

     

    Annually

    Identify target month target 3rd Qtr.

    Review all rules and regulations

     

    Annually

    Identify target month target 3rd Qtr.

    Review/Update Master Plan

     

    Quarterly

    July, Oct., Jan., April ( draft MP revisions for next fiscal year)

    MP approval in June

    Develop annual budget in April

    Approve annual budget in June

     

    Annually

     

    Review Grant Status

    Monthly

     

    After requirement is defined

    Budget submitted to County Board of Supervisors

     

    July

     

    Maintain communication with APS for 3 phase power

    Annually

    Report feed back

    Review and update water conservation program.

    Annually

     

    Communicate _ FLHOA newsletter or Dist letter

    Monitor and report on meters operation -including potential leaks

     

    Monthly

     

    Review and update as required DWID Emergency Plan

    Annually

     

    Review and update as required contingency agreement with one or more water companies

    Annually

     

    Maintain procedure in the Emergency Plan to address a major contamination event

    Annually

    Identify target month 2nd or 3rd quarter Standing IGA with Heber Water District

    Developing and Implementing level billing system

     

    After two years of operation - 2011

     

     

     

    Coordinate activities with ADEQ, RWAA,ADWR and special districts

    On Going

     

    Maintain and report customer complaint process

    Monthly

    Included in month manager report

     

     

     

    Continue to provide articles for the FLOA newsletter

    Quarterly

            

    Water conservation on going priority

    Update District Web page annually

    On Going

    Target after budget Master Plan approval (Paul Studer)

  • Fiscal Year 2009-2010 Objectives:
  • Goal 3: Objective 1: Continue valve mapping and other key distributing components.
  • Goal 3: Objective 2: Prepare exercising plan in 2010

Fiscal Year 2010-2011 Objectives:

  • Goal 1: Objective 1: Complete analysis, project plan and upgrade Trout Spring, Aspen, Pinto and Sheep Spring trail area
  • Fiscal Year 2011-2012 Objectives:

 

  • Goal 1: Objective 2: Complete analysis, project plan and upgrade Snow well with an Arsenic Treatment system
  • Fiscal Year 2012-2013 Objectives:

Water Production and Distribution

  • Goal 1: Objective 3:  Complete analysis, project plan and upgrade Rim loop area
  • Fiscal Year 2013-2014 Objectives
  • Goal 1: Objective 4: Complete analysis, project plan and Upgrade water pipes on West Loop

Water District Board Members 

Ben Purtymun, Chairman

 

 

Signature and Date

Karen Foncannon, Member at Large

 

Signature and Date

Mary Hume, Secretary

 

Signature and Date

John Mc Knight, Vice Chairman

 

Signature and Date

Paul Studer, Treasurer

 

 

Signature and Date

 

 

 

[Home] [Company Info] [Board] [Staff] [District Sites] [Master Plan] [Minutes] [Winter Turn Off/On]

Contact Willcoxone Designs with any questions or comments on this site.

Copyrighted 2009 - 2010 by Forest Lakes Domestic Water Improvement District

All Rights Reserved.